Temporary Closing of Roads
Notice of Intention
Roads Act, 1993
Roads Regulations, 1994
Kildare County Council, on behalf of Uisce Eireann and Coffey, gives notice in accordance with Section 75 of the Roads Act, 1993 and the Roads Regulations, 1994 that it intends to have intermittent closures on the following road from Monday, 22 June 2026 to Friday, 25 September 2026 to facilitate works for the Crodaun Waste Water Network Upgrade.
The intermittent closures will vary in length from 1 to 3 days maximum over this period with closure numbers and durations being kept to a minimum.
|
No. |
Road to be Closed |
From (Junction with) |
To (Junction with) |
Duration of Closure |
|
1 |
R405 Maynooth Road., Celbridge. |
Aghards Road, Celbridge. |
Crodaun Forest Park, Celbridge. (South Entrance) |
22, June 2026 - 25, September 2026 |
|
Alternative Routes: Northbound on R405 Take a left at Celbridge Garda Station / Costa Coffee onto the R449 and continue for 5.3 kilometres until you come to the Barberstown roundabout. Take the third exit off the roundabout onto the R406 towards Maynooth. Continue on the R406 for 4.8 kilometres until you reach a roundabout and take the second exit to stay on the R406 towards Maynooth. Continue for 1 kilometre until you reach the Maxol Petrol Station at the R405 junction and take a right onto the R405 towards Celbridge. Continue on the R405 for 3.5 kilometres until reach the R449 roundabout. Take the second exit off the roundabout to stay on the R405 where the diversion ends. Southbound from R449 When you reach the roundabout at the R405 junction, take the second exit onto the R405 towards Maynooth. Continue on the R405 for 3.5 kilometres until you reach the Maxol Petrol Station at the R406 junction and take a left onto R406 towards Naas. Continue for 1 kilometre until you reach the roundabout south of the M4 motorway and take the second exit to stay on the R406 towards Naas. Continue on the R406 for 4.8 kilometres until you reach the Barberstown roundabout and take the first exit onto the R403 towards Celbridge. Continue on the R403 for 5.3 kilometres until you reach the Maynooth Road junction (R405) and take a left onto the R405 towards Maynooth where the diversion ends. Southbound from R405 When you reach the roundabout at the R405 junction with the R449, take the third exit onto the R405 towards Maynooth. Continue on the R405 for 3.5 kilometres until you reach the Maxol Petrol Station at the R406 junction and take a left onto R406 towards Naas. Continue for 1 kilometre until you reach the roundabout South of the M4 motorway and take the second exit to stay on the R406 towards Naas. Continue on the R406 for 4.8 kilometres until you reach the Barberstown roundabout and take the first exit onto the R403 towards Celbridge. Continue on the R403 for 5.3 kilometres until you reach the Maynooth Road junction (R405) and take a left onto the R405 towards Maynooth where the diversion ends. Temporary traffic management measures, including intermittent road closures, will be implemented over the forementioned period to facilitate phased deep excavation works at selected locations along the route. Advance notice of specific closures will be provided prior to implementation via signage and local outlets. Wherever practicable, such closures will be scheduled outside peak traffic periods, in order to minimise disruption to road users. |
||||
Diversionary routes will be clearly signposted, as agreed with the Council and An Garda Síochána. Emergency access and restricted local access will be maintained.
Any objections/observations should be lodged via our Consultation Portal https://consult.kildarecoco.ie/en and be addressed to the Senior Executive Officer of Transport, Mobility and Open Spaces, Áras Chill Dara, Devoy Park, Naas, Co.Kildare. All submissions must be made on or before 5:00 p.m. on Tuesday, 02 June 2026.











